Project Duration
Stipulated Date of Commencement December 27 2015
Actual Date of Completion April 30 2021
Status
100%
Completed
Cost (₹)
Estimated at ₹ 834,975,942.53
Awarded for ₹ 996,008,692.20

Project highlights

Main Building
Basement:
• CSO (Central Stores office) & Pharmacy store
• Laundry, Stores &maintenance workshops & Parking space
Ground Floor:
• 21 OPD Clinics, Casualty with minor Operation Theatre,
• Diagnostics, Imaging suite, Physiotherapy, Blood Bank, Laboratory
• CSSD (Central Supply Stores Department), IPD Kitchen etc.
First Floor:
• 7 Operation Theatres with Pre & Post-Operative Room, Surgery, ENT IPD ward, Burns ward, Prisoners’ ward etc.
Second Floor:
• Administrative block, 3 OT, Obstetrics & Gynecology and Pediatric IPD wards, NICU (Neonatal Intensive Care Unit), PICU (Pediatric Intensive Care Unit)
Third Floor:
• MICU, ICU, Dialysis, Psychiatry, Medicine, IPD wards
Mortuary Building
• Morgue for 72 cabinets, Autopsy Room, Embalming Room, Waiting, Doctors Rooms, Post Mortem Room etc.
Utility Building
• Transformers, Electrical panel room Chiller system, Water Filtration system, Hot water tanks
• Underground water tanks for raw water, domestic water, soft water and fire water.
• D. G. sets outside