प्रकल्पाची कालावधी
सुरवात जावपाची थारायल्ली तारीख
December 22 2018
पुराय जावपाची प्रत्यक्ष तारीख
January 25 2023
स्थिती
100%
पुराय जाल्ले
खर्च (₹)
अदमास खर्च
₹ 78,819,290.00
दिले
₹ 96,368,939.00
प्रकल्प हायलायट्स
• Demolition of existing old school building and reconstruction of new Ground + 3 structure with total built up are of 4248.65 sq.mts