Project Duration
Stipulated Date of Commencement
January 27 2019
Stipulated Date of Completion /
Likely Date of Completion July 26 2020
Likely Date of Completion July 26 2020
Status
100%
Completed
Cost (₹)
Estimated at
₹ 264,210,157.54
Awarded for
₹ 273,278,371.50
Project highlights
The proposed building for the Goa Board of Secondary and Higher Secondary Education (GBSHSE) is located on a plot area of 8100.00 sq.m. The building has a ground coverage of 2132 sq.m. and has a total floor area (built-up area) of 10283.90 sq.m spread on stilt + three floors.
• The proposed floor area on:
• Lower Ground Floor (Stilts): 2544.23 sq.m
• Ground Floor: 2307.53 sq.m
• First Floor: 1942.97 sq.m
• Second Floor: 2048.17 sq.m
• Attic Floor Area : 1441.00 Sq.m
• The proposed parking area consists of parking spaces for 78 four-wheelers and 48 two-wheelers.